How Did ISL Uranium Mining Begin?
By James Finch |
Tue, 24 Oct 2006
According to the World Nuclear Association, 21 percent of the
world's uranium production came about from ISL mining in 2004. We
conducted interviews with some of the world's top ISL experts,
including the father of ISL, to help you better understand how uranium
is currently mined for the world's nuclear power plants.
It's time to rewrite the history books. In Situ Leach Mining (ISL), or
Solution Mining, was not first commercially started in Bruni, Texas in
1973 by Westinghouse, a consortium of oil companies and others. The
birthplace of ISL was never South Texas, as some have claimed. It was
begun in Wyoming, about 16 years before an ISL operation was started in
Texas. Why there has been a whitewash over the true history of ISL is
not our concern. This series is an in-depth investigation into how and
why ISL mining came about, how it has been tested over a period of
nearly 50 years, and why this type of uranium mining will play an
important role in providing U.S. utilities with the raw fuel to power
nuclear reactors for the next few decades.
In this modern era of uranium mining, extremely skilled engineers,
hydrologists and geologists establish ISL mining operations. Most
insiders compare an ISL operation to a water treatment plant. It's
really that simple to understand. However, as with every modern
industrial operation, the roots of ISL mining came about in a less
genteel or sophisticated manner. In 1958, Charles Don Snow, a uranium
mining and exploration geologist employed by the Utah Construction
Company, was investigating a Wyoming property for possible acquisition
for his company. During the course of that visit, he discovered a new
method of uranium mining and helped pioneer its development into the
modern form of ISL.
Since 1957, R.T. Plum, president of Uranyl Research Company, had been
experimenting with a leach solution on his property at the Lucky June
uranium mine. "They mixed up the sulfuric acid solution and just dumped
it on the ground, and soaked it through the material and collected it
in a little trench at the end," Charles Snow told StockInterview. It
wasn't very scientific. Snow added, "They were just learning how, and I
observed it and thought that the application could be made through some
of the ore that we had in the Lucky Mc mine." The company was mining
uranium this way because it was below the grades miners were used to,
when mining. As Snow noted, "It was not worth mining." But it was
practically at the surface. He explained what they were doing at the
Lucky June, "There was an area where uranium leached out to the surface
in a small area, and it had a clay under-bed. These people put
solutions onto the surface, collected the solution, and ran it by resin
beads to absorb the uranium."
While they only recovered about $3600 worth of uranium, roughly 600
pounds, Snow was impressed. He later wrote an inter-office memorandum
in July 1959, with the subject header: "Recovery of Uranium from Low
Grade Mineralization using a leach in place process." In his
conclusion, Snow recommended, "From the preliminary information
available, it appears that it will be possible to treat very low grade
mineralization for recovery of uranium at a large net profit." He
explained the process to his bosses, encouraging them to consider this
as an option:
"In brief, the process introduces a leach solution onto the surface of
the ground and allows the solution to percolate down through the area
to be leached. The solution is then recovered from wells and circulated
through an ion exchange circuit with the barren solution being returned
to the leach area. Recovery of the uranium is made by stripping from
the ion exchange medium."
He wanted the Utah Construction Company to try this method of mining
where there was low grade mineralization. Snow succeeded in convincing
his bosses. That began yet another innovation for Utah Construction
Company, the same company which helped construct the Hoover Dam,
decades earlier, before it got into the uranium mining business.
Utah Construction Becomes the
First Commercial ISL Miner
Newspaper reports, through the 1960s, illustrate that ISL mining was in
full bloom more than a decade before anyone in Texas began a commercial
ISL operation. On June 18, 1964, the Riverton Ranger newspaper
reported, "The Shirley Basin mine is on a standby basis. The timbers
are being maintained and the water pumped out. Total production comes
from solution mining." Between 1962 and 1969, ISL was the only method
producing uranium at Utah's Shirley Basin Wyoming. Later in that same
article, under the section entitled, "Gas Hills Solution Mining," it
was reported, "The Four Corners area is 'mined' by solution mining
techniques similar to those employed at Shirley Basin." Credit for this
new mining method is also reported in that same article, "Lucky Mc
introduced the heap leach process of recovering values from low grade
ores in 1960."
Charles Snow explained how his company made the transition from
underground mining to solution mining, "The underground mining at
Shirley Basin was very expensive, and we were having a lot of heavy
ground problems." The sandstone aquifers containing the uranium were
uncemented and brittle, supported with timbers. "In some places, it was
too heavy to hold with timbers," said Snow. "We had to use steel sets
underground, and it was even mashing the steel sets. So the expenses
were getting very high."
Water was flowing into the open drifts at prodigious rates. Snow
recalled, "Barney Greenly said, 'Let's try solution mining over here.'
They did a test, and it did operate quite well. They got some pretty
good results. So the underground mine was shut down, and they went to a
solution-mining program to produce the allocated pounds in the Shirley
Basin area." The procedure was tested for a few years before a
full-scale commercial production began. This fulfilled 100 percent of
Utah's Shirley Basin uranium production allotment from the AEC.
There were problems at first. "We started out initially using sulfuric
acid, and we had some reaction with carbonates in the formation."
Sulfuric acid plus calcium carbonate produces calcium sulfate, and this
plugged up the formation. Calcium sulfate is gypsum, which was
insoluble in the leach solution. "It tended to plug up the formation
and reduce the transmissivity of the fluid from the input hole to the
output recovery hole."
To prevent interference with the porosity of the formation, Snow
switched to nitric acid, but admitted, "We were reluctant to use nitric
acid because it was much more expensive than sulfuric." But they did,
because the nitric acid solution did not form gypsum. Unlike
present-day ISL methods used in Texas, Nebraska and Wyoming, Utah
Construction did not use a carbonated leaching solution in their
solution mining. Nitric solution was used during the 1960s and
continued until the Lucky Mc switched over to open pit mining.
It all started as a heap leach experiment. "We had quite a bit of low
grade in Lucky Mc," Snow told us, "so we thought we would try a heap
leach experiment." Results were good on the test, and Utah pioneered
ISL mining. Snow wrote in an August 2, 1960 memo, "The favorable
results of the heap leach project and other research indicate that the
process can be successfully applied in many of the low-grade areas to
recover much of the mineralization." Later in his report, Snow
calculated reserves from random samples obtained from previous drilling
at Lucky Mc, "The estimated reserve for the block is 147,000 tons @
0.0361 percent U3O8, or 106,616 pounds of U3O8." He estimated the
program would cost $111,471. Using a value of $6/pound for U3O8, the
anticipated returns were calculated as follows:
50 percent recovery: 53,318 pounds: $208,377
25 percent recovery: 26,654 pounds: $ 48,453
That was just the start. By the end of the decade, Shirley Basin's
solution mining operation was producing U3O8 at comparable levels to
present day production at any of the major U.S. ISL facilities. In a
paper presented by Ian Ritchie and John S. Anderson, entitled "Solution
Mining in the Shirley Basin," on September 11, 1967, at the American
Mining Congress in Denver, Colorado, these Utah International
executives explained the success of the Shirley Basin solution mining
operation. In a summary explaining the company's activities, we
discovered the Shirley Basin operation not only filled the Atomic
Energy Commission (AEC) allocation requirements from 1962 through 1969
but we learned of the sizeable commitments into the future Shirley
Basin was to fill:
"In 1968 sales of uranium concentrate were made to purchases other than
the AEC. One of the first sales was to Sacramento Municipal Utility
District with a minimum of 950,000 pounds to a maximum of 1,100,000
pounds of uranium concentrate in 1971. Additional contracts were signed
with General Electric Company and with Nordostschwerzerische Kraftwerke
A.G. (Baden, Switzerland). The contracts called for delivery of
8,000,000 pounds of concentrate to GE between 1968 and 1975, and
500,000 pounds of concentrate to NOK commencing in July 1969."
Conclusion
The single reason solution mining stopped, well before the first
"commercial" ISL operation began in Bruni, Texas in 1973, was because
of the improved market forecast for uranium in the 1970s. Utah
Construction switched to open pit mining because they needed to produce
a lot more uranium. The nuclear renaissance of the 1970s demanded
massive quantities of uranium to fuel the rapidly growing nuclear power
industry.
Don Snow's initial field tests, begun in the late 1950s, resulted in
continuous production achieved by late 1962. Subsequently, production
in the underground uranium mine was shut down by May 1962. The
underground mine was maintained in a standby condition until 1965, when
all underground operations were written off. Millions of pounds were
mined by Utah Construction through its ISL operations in Shirley Basin.
It wasn't heap leaching.
Sufficient evidence confirms that Wyoming, not Texas, first pioneered
commercial ISL mining. Not only were well fields designed as early as
1960, but the entire concept of an ISL "water treatment" plant can
trace its roots to Utah Construction's pioneer work. Everything from
injection wells to production wells were pioneered in the early 1960s.
We challenged Charles Don Snow that some have claimed it was heap
leaching, not ISL mining. Snow shot back, "No, we drilled holes in the
ground and the material had never been mined. We got our ideas,
certainly, from heap leaching, which came from the copper industry."
Snow explained that after the solution mining experiment was
successful, "A recovery plant was designed and put into the hoist
house, where they had had the underground mine. That was designed by
Robert Carr Porter and Ian Ritchie." Snow added, "In fact, Ian Ritchie
and J.S. Anderson have a U.S. Patent on the well completion procedures
that we used at Shirley Basin."
Snow pondered if his friend Jack Bailey may have exported the ISL
technology to Texas. "Jack Bailey was the Shirley Basin project manager
for the underground mine when we switched over to solution mining,"
Snow said. "He later went to work for Chevron, and Chevron had
operations in Texas. I believe they even experimented with solution
mining. Now, whether or not Jack was directly involved, I don't know."
As it is with history, many of the old-timers are gone. We were told
Jack Bailey had had a stroke a number of years back, and did not trace
this further. There may have been others. "Some of the people from that
area (Shirley Basin) had gone to Texas," Snow recalled. "There is
documentation, it was published information, and a lot of people who
went to Texas, came from the Wyoming area. So, I'm sure there wasn't a
paucity of information being transferred." Ironically, the
Westinghouse-led consortium, which included U.S. Steel and Union
Carbide, among others, was called Wyoming Minerals. Now we know exactly
why they chose that name.
While there have been a number of ISL operations built and operated in
Texas, there may be little future for uranium mining in that state,
unless there are new discoveries. By a few, Texas has been inaccurately
called the "home of ISL mining." Perhaps that came about because ISL
operations continued, during the uranium depression of the past two
decades, with small amounts of production occurring in Texas. According
to Energy Information Administration figures published in June 2004,
uranium reserves in Texas stand at 23 million pounds of U3O8 based upon
$50/pound uranium. By comparison, Wyoming and New Mexico reserves,
using that same benchmark, reach as high as 363 million and 341 million
pounds, respectively.
This may explain the rush by junior exploration companies, such as
Strathmore Minerals (TSX: STM; Other OTC: STHJF), Energy Metals
Corporation (TSX: EMC), UR-Energy (TSX: URE), Uranerz Energy (OTC BB:
URNZ), Kilgore Minerals (TSX: KAU) and others, to Wyoming. The large
quantities of pounds are in Wyoming, not Texas. It may also explain why
Uranium Resources (OTC BB: URRE) has looked beyond Texas into New
Mexico to develop its ISL operation, and Strathmore Minerals has
quickly been advancing through its permitting stage on one of its
properties in that state. It is fitting that the big past uranium
producing states may again become tomorrow's leading U.S. producers. In
any event, the entire world of ISL mining owes a debt of gratitude to
Charles Don Snow for his pioneering efforts in bringing a heap leach
experiment into full fruition as modern-day in-situ mining.